Offshore substation installation is a heavy lift operation (2,000t plus) requiring vessels with sufficient crane capacity. Vessels with the necessary lift capacity typically do not have the deck space to accommodate a substation platform. The substation is therefore floated out of the substation fabrication facility on a barge, usually directly to the wind farm site. The substation foundation, which is installed prior to the topside structure, may be a monopile or a jacket and the installation may form part of the turbine foundation installation package.Â